Serving Port Orange & Volusia County  |  Call Now: (386) 220-8770
📞 (386) 220-8770
★★★★★ 5.0 Google Rated · Verified Reviews
Fully Insured
Free Estimates
Locally Owned — Volusia County
Concrete patio with wicker seating beside a screened porch and white fence, concrete work in Daytona Beach Shores, FL
Serving Daytona Beach Shores, FL

Concrete Contractors in Daytona Beach Shores, FL

Driveways, walks and pads on the Shores, built to the city's flood-zone and oceanfront rules. Free estimates.

Fully Insured
Free Quotes
5-Star Google Rated

Get Your Free Daytona Beach Shores Estimate

Tell us about your project and we'll get back to you within 24 hours with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Response within 24 hours
  • Insured and locally owned
  • Transparent pricing — no hidden fees
  • Volusia County concrete experience

Quick answer

A patio slab on the Shores answers to a flood map, a coastal setback line and the city's permit desk. As concrete contractors in Daytona Beach Shores, we pull the permit, follow the Zone V slab rule where it applies, and hand you a free written estimate once we've seen the site.

Daytona Beach Shores at a glance

Permit office: City of Daytona Beach Shores Building Division · official site Applications go through the city's online permitting portal. The division also verifies contractor licensure and runs inspections.

Concrete Contractors in Daytona Beach Shores Work Beside the Towers

The Shores is a narrow barrier-island city, squeezed between the Atlantic Ocean and the Halifax River, with 5.5 miles of beach. It incorporated in 1960 and sits between Wilbur-by-the-Sea and Daytona Beach. Condo booms in the 1970s and 1980s, and another in the early 2000s, left about 90% of residents living in oceanfront high-rises. The housing numbers tell it: of 6,337 units, 82.1% sit in buildings of 20 or more units, and only 8.1% are single-family detached homes. So a job on the Shores is as likely to be a condo parking area or walkway as a single-family driveway.

The city's Building Division handles permits, plan review and inspections. Condo and home owners should take its advice: get approved final inspections before you make final payments to the crew. Begin before the permit is issued and the fees double, plus a $100 penalty. When the job needs a permit, we pull it. Hold the last payment on any job until that approved final inspection is in hand.

Our slab page and sidewalk page show the pours we price on island sites.

Concrete front walkway joining the public sidewalk at a ranch home, concrete work in Daytona Beach Shores, FL

Zone V Slabs Are Thin, Unreinforced and Independent of the Building

A normal slab is built to resist cracking. In the city's coastal high hazard zone, it's built to let go. Under the flood chapter of the land development code (Sec. 10-37.5), slabs used as parking pads, landings, decks, walkways and patios beneath or next to buildings in Zone V have to be structurally independent of the building foundation, frangible, not reinforced and no more than 4 inches thick. A deck or patio below the design flood elevation also has to stand apart from the building (Sec. 10-37.6). The idea: a surge breaks the slab apart instead of dragging the building with it. The Florida Building Code adds joints both ways at most 4 feet apart.

FEMA's flood layer shows how much of the city that covers. Roughly 82% is Zone X. About 11.5% is Zone VE, with base flood elevations around 9 to 10 ft on the ocean side, and 6.6% is Zone AE at 4 to 6 ft on the river side. Zone X lots skip the frangible rule, but your lot can differ from the one next door. Call the Building Division and they'll look up your flood zone, help with an elevation certificate and visit the site, all at no charge. City flood actions also earn policyholders in the special flood hazard area a 15% discount.

Oceanfront Setbacks and the State's Control Line

On the beach side, two separate lines can limit a pour. The city draws the first one. In multifamily and hotel districts on the ocean, the coastal construction setback line sits 50 ft landward of the onsite seawall (or the seawall line), and nothing may be built or placed inside it. In single-family districts on the ocean, the setback follows the building line formed by the neighboring houses, landward of the seawall, seawall line or frontal dunes.

The state draws the second. Under F.S. 161.053, a permit to alter, excavate or construct seaward of an established Coastal Construction Control Line comes from the Department of Environmental Protection, unless an approved local code applies. For minor projects like sidewalks and driveways, FDEP can issue general permits. Is your parcel seaward of the line? Ask the Building Division and FDEP, and let your survey answer it before you design anything. The city also asks applicants to get sea turtle lighting approval from Volusia County. Retaining wall and seawall installation and replacement are on the city's permit list as well, so see our retaining wall page. The longer story is in our beachside concrete guide.

Concrete patio with Adirondack chairs around a fire pit and string lights, concrete work in Daytona Beach Shores, FL

Driveways, Sidewalks and the South Atlantic Avenue Frontage

Cutting a curb or opening a new driveway onto a street takes a permit from the Building Official. At the right-of-way line a driveway runs 20 to 24 ft wide, though a single-family home can go as narrow as 12 ft. Lots under 65 ft wide get one access point. Lots 65 to 200 ft wide get two. Openings sit 12 ft apart, and none sits within 10 ft of the corner of two street right-of-way lines. Those city rules stop at streets under FDOT jurisdiction, and the code warns that Volusia County or FDOT may require a separate permit on roads they control. If your lot touches South Atlantic Avenue, ask concrete contractors in Daytona Beach Shores about it first.

South Atlantic Avenue also carries a sidewalk rule. Put a new principal building on a lot that adjoins South Atlantic Avenue and the owner installs sidewalks in the public right-of-way, at their own expense and with FDOT consent, before the certificate of occupancy. New development south of Dunlawton Avenue has the same frontage duty. Sidewalks run $8 to $13 per sq ft, so 60 ft of 4-foot-wide walk is 240 sq ft, or $1,920 to $3,120, and every job gets a free written estimate after we see the site. Driveways run $7 to $12 per sq ft, and the driveway page has the details.

Sand, Setbacks and Open-Space Math on the Island

Under the island, NRCS soil mapping shows deep, excessively drained sand. The Palm Beach-Urban land-Paola complex covers about two thirds of the city, and the Palm Beach-Paola association covers another 22%. Palm Beach sand formed in thick deposits of sand and shell fragments. Water drains fast through it, so standing water under a slab worries us less here than compaction and a firm edge. We prep the base first, then set forms. NOAA's normals at Daytona Beach International Airport name September, June, August and July as the wettest months, and hurricane season runs June 1 to November 30. We book Shores pours with that weather in mind.

On the lot itself, the single-family RSF-1 district runs 10,000 sq ft lots, 85 ft wide, with 30 ft front, 25 ft rear and 10 ft side yards. Waterfront yards are 25 ft on the river and 50 ft on the ocean. Buildings can cover 35% of the lot. Accessory structures stay out of the front and side yards but can sit in the rear yard 5 ft from the rear lot line. The code counts land with no impervious surface as open space, which means a big new patio eats into your open-space credit. Neighbors on the South Daytona, Ponce Inlet and Daytona Beach sides can call us the same way. Start with our permit guide, then talk to us, concrete contractors in Daytona Beach Shores, about the island numbers.

Sources

  1. Building Division, City of Daytona Beach Shores
  2. Work that Requires a Permit, City of Daytona Beach Shores
  3. Permitting Tips and Guidance, City of Daytona Beach Shores
  4. Flood Insurance Information, City of Daytona Beach Shores
  5. History, City of Daytona Beach Shores
  6. Sec. 10-37 Other development (flood), Daytona Beach Shores Land Development Code (Municode)
  7. Sec. 14-33 Access control and sidewalks, Daytona Beach Shores Land Development Code (Municode)
  8. Sec. 14-59 Coastal construction setback line, Daytona Beach Shores Land Development Code (Municode)
  9. F.S. 161.053 Coastal construction and excavation, Online Sunshine, Florida Legislature
  10. Coastal Construction Control Line Program, Florida Department of Environmental Protection
  11. NCEI U.S. Climate Normals 1991-2020, monthly, NOAA NCEI
  12. National Flood Hazard Layer, FEMA
Low view of ashlar-pattern stamped concrete in front of a home, concrete work in Daytona Beach Shores, FL

Why Daytona Beach Shores Residents Trust Us

Zone V slabs, done right

Beside oceanfront buildings in Zone V the city wants a thin, unreinforced, independent slab. We build that slab and give it its own price line.

We pull the permits

When the job needs a permit, we pull it through the city's online portal before work starts, so the double-fee penalty never comes into play.

Paperwork boards can compare

A written estimate with sq ft, thickness and scope lets a board compare bids before any work begins.

Locally Owned, 40+ years

40+ years of experience and Fully Insured crews. You get a free written estimate after we see the site.

Our Process in Daytona Beach Shores

01

Walk the site

We check the flood zone, the setbacks and what the survey shows. Any digging needs a Sunshine 811 locate at least 2 full business days ahead.

02

Written estimate

Your free written estimate lists sq ft, thickness and any frangible-slab extras.

03

City permit

We file through the Daytona Beach Shores online permitting portal. Jobs over $2,500 also need a recorded Notice of Commencement.

04

Pour and inspection

We pour and finish the slab, then book the inspection with the Building Division.

05

Final sign-off

The city suggests holding the last payment until the approved final inspection is in hand, and we schedule ours so you can.

What Our Clients Say

★★★★★ 5.0 / 5 Verified 5-star Google reviews
★★★★★

“Awesome job on the foundation! Will hire again 👍 they were quick and on time, and its level and strong.”

Ashley RicardoFoundation
★★★★★

“Port Orange Concrete Co. was awesome to work with! They took our idea and made it even better than we imagined. The crew was super friendly, showed up on time, and really knew their stuff. Our new patio looks incredible—we're beyond happy! Definitely recommend them.”

Jose LaraConcrete Patio
★★★★★

“I hired Port Orange Concrete Co. to replace our front walkway, and I'm so glad I did. The team was friendly and really helped us pick the perfect design to match our home. They showed up on time, worked efficiently, and paid attention to all the little details. The walkway turned out beautifully, and our neighbors have already noticed and complimented it. I had a small concern after the project was done, and they addressed it right away, making sure we were completely happy. If you need concrete work, I highly recommend Port Orange Concrete Co.—they really care about their customers”

NY LeahWalkway
★★★★★

“Gave me a great deal on my concrete driveway replacement, and did way better than the team that originally installed it. The owner is friendly, honest, and cheerful. Will use these guys again someday!”

Matthew MillerDriveway Replacement
Call (386) 220-8770

Daytona Beach Shores Concrete Questions

Does a new concrete patio or driveway in Daytona Beach Shores need a permit?
Yes. The Building Division's permit list names deck, patio and porch placement or replacement, and a new driveway opening needs a permit from the Building Official under the land development code. Begin before the permit is issued and the fees double, plus a $100 penalty. Make sure whoever pours it pulls one.
Why can't a Zone V patio slab on the Shores have rebar?
In the coastal high hazard zone, slabs beneath or next to buildings must be frangible and unreinforced, no more than 4 inches thick, and independent of the foundation. A flood surge should break the slab apart instead of loading the building. Slabs outside Zone V follow the normal reinforcement rules.
How close to the ocean can I build on a Daytona Beach Shores oceanfront lot?
That depends on the district. Multifamily and hotel lots keep everything 50 ft landward of the seawall or seawall line. Single-family lots follow the building line set by the neighboring houses. Seaward of the state's Coastal Construction Control Line, FDEP permits apply. Your survey and the Building Division sort out which one is yours.
How wide can a Shores driveway be?
At the right-of-way line, between 20 and 24 ft. A single-family home may go as narrow as 12 ft. Lots under 65 ft wide get one access point, and lots 65 to 200 ft wide get two, spaced 12 ft apart. Roads under FDOT jurisdiction sit outside the city rules.
What should condo boards ask concrete contractors in Daytona Beach Shores?
Ask who pulls the permit, what sq ft and thickness the written estimate lists, and whether the plan accounts for Zone V and the setback line. Then follow the city's advice: get approved final inspections before final payments. We give boards a written scope they can compare.
Is my lot on the Shores in a V zone?
The city's Building Division does free flood zone lookups, elevation certificates and site visits. FEMA's map covers the city with Zone X, VE and AE, so ocean-side lots face different rules than river-side ones. Ask for the lookup before you design a slab. We use it in the estimate.

Our Work Near Daytona Beach Shores

Recent concrete projects in the Daytona Beach Shores area.

Concrete front walkway joining the public sidewalk at a ranch home, concrete work in Daytona Beach Shores, FL
Concrete patio with Adirondack chairs around a fire pit and string lights, concrete work in Daytona Beach Shores, FL
Low view of ashlar-pattern stamped concrete in front of a home, concrete work in Daytona Beach Shores, FL

Planning a pour on the Shores?

Talk with concrete contractors in Daytona Beach Shores who know the Zone V rule and the setback line. Call (386) 220-8770 for a free written estimate. We pour in Port Orange and Holly Hill, too.

📞 Call (386) 220-8770 Request Quote Online
📞 Call Now Get Quote
Free Quote