Serving Port Orange & Volusia County Β |Β  Call Now: (386) 220-8770
πŸ“ž (386) 220-8770
β˜…β˜…β˜…β˜…β˜… 5.0 Google Rated Β· 14 Google reviews
Fully Insured
Free Estimates
Locally Owned β€” Volusia County
Crew placing a large concrete slab inside forms between neighborhood homes, slab work in Port Orange, FL
Slabs Β· Port Orange, FL

Concrete Slab Contractors in Port Orange, FL

In Port Orange we pour and finish shed pads, garage floors, RV pads and equipment pads. Free written estimates.

Fully Insured
Free Quotes
5-Star Google Rated

Get Your Free Port Orange Estimate

Tell us about your project and we'll get back to you within 24 hours with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Response within 24 hours
  • Insured and locally owned
  • Transparent pricing β€” no hidden fees
  • Volusia County concrete experience

Quick answer

As a concrete slab contractor in Port Orange, we see each pad hit its own rule. Sheds change at 120 sq ft, garage floors must slope to drain, and an RV pad in the front yard counts toward a 40 percent paving cap. Port Orange Concrete Co pours them all, and the free written estimate comes after we see the site.

Concrete slab contractor in Port Orange: pads, floors and where the lines fall

A concrete slab is any flat, formed pour that carries weight. That covers the pad under a shed, a garage floor, a pad for an RV or boat, a workshop floor, and the base for a generator or air handler. In Port Orange each one hits its own size line, setback or drainage rule. Those rules shape the design before the concrete does.

We sort the work by what the slab holds up. This page is for sheds, detached garages, workshops and equipment pads. A slab under a house or addition is a footing job, so head to our foundation page. Barn, metal building and barndominium floors belong on the pole barn page. For a car pad plus the apron, try the driveway page.

Shed pads: the 120 sq ft line in Port Orange

The city's Permitting Guide has a "Shed 120 Sq. Ft. or More" permit and asks for a survey, sealed drawings and anchor details. The anchor detail brings the slab layout into it, since the shed's tie-down points and the pad's edge have to match.

Setbacks grow with size under the special setback rules. A storage building up to 120 sq ft sits 5 feet from the property line. From 121 to 250 sq ft, it moves to 10 feet from the rear and side lines, or the house's side setback if that's less. From 251 sq ft, it follows the house's setbacks. A 10 x 12 pad is exactly 120, but a 12 x 12 is 144 and crosses the line.

Under Port Orange's HB 803 guidance, accessory structures count as structural work, so the under-$7,500 exemption doesn't apply, and it's void on any lot in a flood hazard area. In unincorporated Samsula, county Code Sec. 72-277(d) lets a shed of 480 sq ft or less on a single-family lot go up without a shed building permit, as long as it still meets the accessory and flood rules. If your size sits near one of these lines, we check it first at the site visit.

Here are our slab ranges for Port Orange and Volusia County. The size of the pad sets each project total.

JobPer sq ftProject totalWhat moves the price
Shed pad, about 200 sq ft$7 to $12Job minimum, low end of $1,500 to $6,900Anchor layout, access and the small-job minimum
Garage slab, 20 x 24 (480 sq ft)$7 to $12$3,360 to $5,760Slope to drain, footing edge and reinforcement
Garage slab, 24 x 24 (576 sq ft)$7 to $12$4,032 to $6,912Thickness for a lift or workshop corner
RV or boat pad, 12 x 35 (420 sq ft)$7 to $12$2,940 to $5,0404 or 5 inches, and side-yard or front-yard rules
Workshop slab, 24 x 30 (720 sq ft)$7 to $12$5,040 to $8,640Heavy loads, joint layout and truck access

We price slabs on 4 inches, reinforced. A pad under about 200 sq ft gets a job minimum. Your free written estimate comes after we see the site.

Crew placing a concrete slab from a pump truck beside a single-story home, slab work in Port Orange, FL

Garage and workshop slabs: slope, thickness and the footing edge

Under R309.1 of the Florida Building Code, a garage floor is approved noncombustible material, sloped to a drain or toward the main vehicle door. We build the pitch into the forms so water runs out of the bay and never sits by the door. R506.1 sets the slab itself at 3 1/2 inches minimum. We price on 4 inches, reinforced.

If a garage slab has a footing edge, the footing goes 12 inches below finished grade. R402.2 puts garage floors at 2,500, 3,000 or 3,500 psi depending on how severe the weathering exposure is, and your plans name the number. Put a workshop corner or a vehicle lift in a detached garage and the load goes up, so we thicken the slab where the lift or the bench sits.

Here's the math at our $7 to $12 per sq ft range. A 20 x 24 garage slab is 480 sq ft, so $3,360 to $5,760. A 24 x 24 is 576 sq ft, so $4,032 to $6,912. A 24 x 30 workshop slab is 720 sq ft, so $5,040 to $8,640.

RV, boat and equipment pads under Port Orange's front-yard rules

Any concrete slab contractor in Port Orange forming an RV pad starts with the city's paving rules. Set a trailer or motorhome on a new front-yard pad and the paving rules kick in. Land Development Code Ch. 12 Sec. 3(g) caps front-yard driveway and parking coverage at 40 percent, and "Both pervious and impervious surfaces shall be considered." That coverage also has to stay directly in front of the garage or in the side yard, and it can't widen toward the center of the front yard unless it's a circular driveway.

Code Sec. 70-36 allows front-yard parking only on approved driveways: concrete or paved material, contained loose material inside a rigid border, or concrete paver strips and similar semi-pervious material. Grass and dirt don't count. You'll have an easier time with a side-yard pad. If that pad ties into the driveway, a standard driveway's nearest edge has to stay at least 5 feet from a side property line on a local street.

Weight decides thickness. The Concrete Network, citing the Tennessee Concrete Association, says going from 4 to 5 inches adds about 20 percent to concrete cost for nearly 50 percent more load capacity, and a loaded RV or boat trailer earns that extra inch. A 12 x 35 pad is 420 sq ft, or $2,940 to $5,040. Setting a generator or HVAC unit? Send the equipment's installation sheet and we'll size the pad to its footprint.

Smooth concrete garage floor seen from inside an open garage, slab work in Port Orange, FL

What the slab sits on: sand, roots and standing water

A slab is thin. It's only as flat as the ground under it. Port Orange has poorly drained flatwoods sands, where NRCS expects a seasonal high water table, and fast-draining ridge sands. On the wet ground we grade so water leaves the pad and doesn't soak its edge. On the dry ground the job is compaction, since loose sand settles under a wheel load.

Under R506.2.1, fill under a slab maxes out at 24 inches of clean sand or gravel, or 8 inches of earth, unless the building official approves more. It has to be free of vegetation and foreign material and compacted for uniform support. Big oaks grow here too. UF/IFAS warns that live oak roots can lift and crack nearby surfaces, so at the site visit we mark the root zone and see if the pad should shift a few feet.

Pads that tie to a house add one more step. Termite protection under R318.1.6 reaches 1 foot out from the sidewalls, and soil disturbed after treatment must be retreated. Sunshine 811 gets a call before we dig. You tell us about private lines such as irrigation, which the member utilities don't mark.

Joints, shrinkage cracks and the first week

Concrete shrinks as it cures. Give the cracks a planned place to go. R506.2.4 calls for contraction joints per ACI 332, unless fibers or 6x6 welded wire keep cracks in check. IRMCA's homeowner guide sets joints no more than 10 feet apart, cut at least a quarter of the slab depth. On a 24 x 24 garage, that works out to a grid of 3 by 3 panels, about 8 feet each.

Cracks that show up in the first day or two point to plastic shrinkage. NRMCA explains that they form when surface moisture evaporates faster than bleed water rises, and that wind over 5 mph, low humidity and high temperatures raise the risk. Synthetic fibers at 1 to 2 pounds per cubic yard cut down on them but carry no structural load. NRMCA also says to dampen the subgrade on hot, dry days and keep water off the surface during finishing.

Curing begins right after finishing and runs 3 to 7 days. Keep cars off for at least a week. For sealer, IRMCA suggests waiting about 30 days after placement.

Measurements and photos to send for a slab estimate

  • Length, width and what will sit on the slab: a shed, car, RV, boat, lift or equipment
  • A photo of the spot, plus one of the nearest oak, fence or neighbor's line
  • The shed or building plan, including its anchor or tie-down layout
  • Your survey, if you have it, so we can check setbacks and the front-yard 40 percent cap
  • Which way water runs after a hard rain, and where irrigation or septic lines sit

Send those over and we'll price it. We're concrete slab contractors in Port Orange, and we pour what we quote. If the job needs a permit, we pull it. The county permit guide shows who handles what, and the cost guide shows how we build our per-sq-ft ranges.

Crew screeding a fresh concrete slab inside wood forms on a sandy lot, slab work in Port Orange, FL

What to Expect, Start to Finish

01

Measure and check the rules

We measure the pad and check it against the size lines: 120 sq ft for a shed, the front-yard 40 percent cap and your setbacks.

02

Permit if the job needs one

If the job needs a permit, we pull it, working from your survey and the shed or building plan.

03

Prep the base

Once the Sunshine 811 locate is done, we strip, grade and compact the pad, and lay the vapor retarder where one is needed.

04

Form and reinforce

We set the forms square and pitched to drain. Steel or fiber goes in, and anchor points follow the shed or lift layout.

05

Pour, finish and joint

We place and finish the concrete, then cut or tool joints on the grid.

06

Cure

Keep traffic off for the first week. We'll tell you when the pad can take the shed, the car or the equipment.

What Our Clients Say

5.0 out of 5 from 14 Google reviews See all reviews on Google

  • I called four companies about tearing out our cracked patio and putting in a bigger one. Two never came out, one came out and never sent a number, and one texted a price with nothing else. These guys came out the next morning, measured, and the owner sat at our kitchen table and went through what he would do and why, including why he wanted it a little thicker where the grill sits. The quote matched the bill to the dollar. What stuck with me was the crew. We have a newborn at home and they kept the radio off and the noise down without us asking. They carried every bag through the side gate instead of across the lawn too. Patio came out flat and drains away from the house like it should. Real people doing honest work.
    Jeannicole Β· Google review Β· Oct 2026
  • One panel on the sidewalk had cracked through and was starting to tip. They cut it back to the joints on both sides and poured fresh. The seam is barely there. Quick too, same morning
    Scharika Β· Google review Β· Oct 2026
  • Poured our back patio and a little walkway to the shed. Showed up when they said, worked clean, hauled the old broken stuff off. Couldn't be happier with it
    Sharon Β· Google review Β· Oct 2026
  • Got a stamped concrete walkway with a leaf pattern it’s so pretty i catch myself just staring at it the color they mixed is exactly what I wanted
    Katie Β· Google review Β· Sep 2026
  • Driveway looks great, they scored it in clean sections so it wont crack random like the last one. Smart work"
    Guess Β· Google review Β· Sep 2026
  • Port Orange Concrete Co. was awesome to work with! They took our idea and made it even better than we imagined. The crew was super friendly, showed up on time, and really knew their stuff. Our new patio looks incredibleβ€”we’re beyond happy! Definitely recommend them.
    Jose Β· Google review Β· Dec 2024
  • Awesome job on the foundation! Will hire again πŸ‘ they were quick and on time, and its level and strong.
    Ashley Β· Google review Β· Dec 2024
  • I hired Port Orange Concrete Co. to replace our front walkway, and I’m so glad I did. The team was friendly and really helped us pick the perfect design to match our home. They showed up on time, worked efficiently, and paid attention to all the little details. The walkway turned out beautifully, and our neighbors have already noticed and complimented it. I had a small concern after the project was done, and they addressed it right away, making sure we were completely happy. If you need concrete work, I highly recommend Port Orange Concrete Co.β€”they really care about their customers
    NY Β· Google review Β· Aug 2024
  • They were punctual and professional did a great job on my driveway.Replacement will hire again
    Blake Β· Google review Β· Aug 2024
  • Gave me a great deal on my concrete driveway replacement, and did way better than the team that originally installed it. The owner is friendly, honest, and cheerful. Will use these guys again someday!
    Matthew Β· Google review Β· Aug 2024
  • Got a new concrete driveway and it looks beautiful. THANKS GUYS!!
    Angela Β· Google review Β· Aug 2024
  • Port orange concrete co did a wonderjob job with my new concrete patio, they were respectful of my property and worked hard
    Frank Β· Google review Β· Aug 2024
Call (386) 220-8770

Slabs & Foundations Projects

Recent slabs & foundations work in the Port Orange area.

Crew placing a concrete slab from a pump truck beside a single-story home, slab work in Port Orange, FL
Smooth concrete garage floor seen from inside an open garage, slab work in Port Orange, FL
Crew screeding a fresh concrete slab inside wood forms on a sandy lot, slab work in Port Orange, FL

Frequently Asked Questions

How thick should a shed slab be?
The code minimum for a slab-on-ground floor is 3 1/2 inches, and we price slabs on 4 inches, reinforced. A shed with a mower, a bench and shelves doesn't need more. If it will hold a lift, heavy tools or a vehicle, go to 5 inches and tell us at the estimate.
Do I need a permit for a shed slab in Port Orange?
The city's Permitting Guide lists sheds of 120 sq ft or more, with a survey, sealed drawings and anchor details. Under 120 sq ft, ask the Building Division before you form the pad, since the setbacks still apply. The HB 803 exemption doesn't cover accessory structures, so expect the normal route.
What is a monolithic slab, and is it the right pad for a garage?
A monolithic slab pours the floor and a thickened edge together, so no joint sits between them. It suits a detached garage on level, well-drained ground. On a low lot, or a garage that ties into a house, the footing and floor get poured as a foundation, and the engineer's drawing decides.
What does a concrete slab contractor in Port Orange charge for a 24 x 24 garage?
A 24 x 24 garage is 576 sq ft. A concrete slab contractor in Port Orange prices it per sq ft, and at our $7 to $12 per sq ft range that comes to $4,032 to $6,912. A thicker slab for a lift, a longer reach for the truck or a lot that needs fill will move the number. Each line shows up in the free written estimate.
Can I park an RV on a new slab in my front yard?
Only on an approved surface, and only directly in front of the garage or in the side yard. Under Ch. 12 Sec. 3(g), front-yard paving, pervious and impervious together, can't pass 40 percent of the yard. Check your survey, or send it to us, before we form the pad.
Does a garage slab need a vapor barrier in Florida?
R506.2.3 puts a 6-mil vapor retarder under floor slabs but excuses garages, unheated accessory structures, carports and flatwork not likely to be enclosed and heated later. Plan to convert the garage into living space? Tell us now, because the answer changes, and the retarder goes in before the pour, not after.
Why did my new slab get hairline cracks the first day?
That points to plastic shrinkage, which happens when the surface dries faster than bleed water rises. Wind over 5 mph, low humidity and heat make it worse. Fibers cut it down, and quick curing and a dampened subgrade help. Contraction joints on a 10 foot grid give the bigger shrinkage cracks a planned place to go.